Updated:

Poland · our main market

Market entry Poland for engineering, energy and industrial companies

Poland is one of the largest energy and infrastructure investment markets in the EU: big programmes in grids and renewables and a steady flow of EPC projects. For foreign companies it is also the base for the next step, Ukraine. the nech takes companies into the Polish market in three stages: market and hypothesis validation, market launch, scaling.

Discuss your project
Constructivist illustration: map of Poland, an office building with Polish and EU flags, people with briefcases
28.5 GW
of solar capacity, 1.10.2026 (PSE)
12 GW
of wind capacity, 1.11.2026 (PSE)
PLN 64 bn
PSE grid investment to 2034
18 GW
of offshore wind by 2040, government target

Why Poland

Why Poland?

  1. 01

    Scale of investment

    The Polish government has presented a programme of 100 GW of renewable energy by 2040. The PSE plan for 2025-2034 includes about 4,700 km of new 400 kV lines and 28 new substations.

  2. 02

    New niches

    In July 2026 the first offshore wind farm, Baltic Power, delivered power to the grid. Biomethane is only starting: the first plants are already connected to the gas grid, and the operator PSG has signed dozens of connection agreements.

  3. 03

    EU rules, central location

    An EU member with EU standards and procurement rules, in the middle of Central Europe. First meetings with Polish clients can be arranged within days.

  4. 04

    A base for Ukraine

    Polish references, partners and a team in Warsaw make the next step, Ukraine and its reconstruction, faster and safer.

The market from the inside

How do large projects buy in Poland?

No single person makes the decision. To sell equipment or a service, you need to know every link in the chain.

  1. 01

    Investor and developer

    Set the budget, schedule and supplier requirements. They often work with Polish and international banks that have their own equipment requirements.

  2. 02

    Designer

    Writes the technical specification. If your equipment is not in the specification, it will not be in the tender.

  3. 03

    EPC contractor and general contractor

    Run the tenders, qualify subcontractors and suppliers, and ask for references and documents in Polish.

  4. 04

    Grid operators

    PSE is responsible for transmission, the distribution system operators (OSD) for connections. The connection queue is long: solar projects alone hold grid connection conditions for more than 40 GW.

Experience

First-year mistakes in Poland

  • «It is just another EU market»

    The Polish market looks familiar, but it decides and buys differently. Without validating hypotheses, a company spends a year on the wrong segment.

  • A trade fair without meetings

    A stand without meetings booked in advance rarely brings contracts. Negotiations need to be planned before the event.

  • No Polish references

    General contractors want to see projects in the EU and documents in Polish. The first reference project has to be built deliberately.

  • Entering without a partner

    Getting into a large EPC tender alone is hard. A partner, a subcontract or a consortium often gives a faster start.

  • Competing on price

    A lower price does not replace trust, service and warranties. The client compares risks, not just cost.

  • No one on the ground

    Without someone who negotiates on the company’s behalf, interest fades after the first meeting.

Entry model

How to enter the Polish market?

The choice of model depends on the product, the sales cycle and how your clients buy. That is why we start with conversations with clients, not with assumptions.

  1. 01

    Direct export

    You supply from your home country, and negotiations with clients are run by your team or by us on your behalf.

  2. 02

    Distributor or agent

    A local partner buys or acts as an intermediary and already knows how this market buys.

  3. 03

    Local partner

    Joint projects with a company that already has clients and references in Poland: a subcontract or a consortium.

  4. 04

    Your own company

    Full control and your own team in Poland, but the highest costs and the longest road to the first revenue.

How we work

Market entry Poland in three stages

  • 01 · Market and hypothesis validation

    45-90 days. Conversations with companies in the market, client feedback, a go / no-go decision and the entry strategy.

  • 02 · Market launch

    3-6 months. We represent your company and negotiate with clients and partners up to the first contracts.

  • 03 · Scaling

    New segments, markets and directions when your projects in Poland reach a plateau, including the step into Ukraine.

Our goal: to help you build your own team in Poland. Until it is in place, we are not an intermediary: we represent your company and act on its behalf.

FAQ

Questions about market entry Poland

Do we need a Polish company to start?

No. Market validation and the first negotiations can start without a legal entity in Poland. Whether you need your own company becomes clear after the first conversations with clients.

How long does market entry in Poland take?

Market and hypothesis validation takes 45-90 days, the launch 3-6 months. In B2B with large projects, the first contracts usually come after 3-12 months, depending on the procurement cycle.

Which sectors have the most potential for foreign companies?

Energy: solar and wind generation, energy storage, grids and substations, biogas and biomethane. Also infrastructure and industrial projects that need engineering, equipment and construction.

Do you also help with Ukraine?

Yes. Poland is our main market, and Ukraine is the next step: from Poland with the same partners and market knowledge, or from the EU directly to Ukraine.

Where do we start?

With a first call: we look at your product, expertise and hypotheses about Poland and decide which stage to start with.

Sources: PSE (solar and wind capacity as of 1.10 and 1.11.2026, transmission grid development plan 2025-2034 agreed with URE), WindEurope (Baltic Power first power, 10.07.2026; 18 GW target by 2040), Polish Ministry of Climate and Environment (100 GW renewables programme to 2040), Institute for Renewable Energy IEO (grid connection conditions for solar, August 2026), GTAI (biomethane and PSG agreements, October 2026).

Shall we discuss
entering Poland?

A first call to understand which stage is the right start for you.Online or at our office in Warsaw · no commitment

Discuss your project